Belvidere Gym Floor Replacement *
Scope of Work:
Install new athletic floor.
Project Description:
The existing gymnasium floor at Belvidere
Elementary School was painted concrete.
As a pilot program for the District, a new
6.5mm athletic flooring system was
installed over the existing concrete. The
impact of the new floor improved the
overall quality of the existing gymnasium
by enhancing aesthetics and acoustics
while providing a much safer and
user-friendly gymnasium for kids and
adults.
Construction Cost:
$50,000
Year Completed:
2013