Fritz Co Grille - Multiple Locations*
Scope of Work:
Remodel existing auditorium and replace
existing floor stage.
Project Description:
The Auditorium Remodel portion of this
project was limited to upgrading wall
finishes from the dated wood veneer. To
accomplish this, decorative thermoplastic
wall panels of differing textures, finishes
and colors were applied to the existing
substrate. Existing wood trim was painted,
additional trim added, and existing
return-air grilles (at each side wall offset)
replaced with decorative perforated metal
panels.
The Stage Floor Replacement included the
complete tear-off and replacement of the
wood floor system. The new system
consists of a floating wood floor resting on
impact-absorbing cushions to minimize
impact noises and floor squeaks. The floor
planking is white pine, chosen for
economy and softness for sinking nails
and screws for prop support / anchoring.
The floor is painted with a flat black paint
to minimize light refraction during
performances.
Construction Cost:
$80,000
Year Completed:
2013
*Completed while employed by others